Inspections

INSPECTIONS

  • Final Electrical Inspection

    Inspection of the completed electrical system to verify compliance with the National Electrical Code.

  • Grounding and Bonding System Inspection

    Inspection of the electrical grounding system, which includes the bonding to establish electrical continuity and conductivity.

  • Rough Electric Inspection

    All electrical boxes in place, electrical cables or raceway installed and all boxes bonded. This inspection occurs prior to any devices or boxes being made up. This inspection is made after the roof, framing, fire-blocking, fire-stopping, draft stopping, and bracing is in place and the structure is weather tight

  • Rough Low Voltage Inspection

    All electrical boxes in place, electrical cables or raceway installed and all boxes bonded. This inspection occurs prior to any devices or boxes are made up. This inspection is made after the roof, framing, fire-blocking, fire-stopping, draft stopping, and bracing are in place and the structure is weather tight

  • Underground Electrical Inspection

    Inspection of the raceway or cable assembly installation prior to covering. The raceway or cable assembly must be installed on clean fill without debris or rocks that may damage the installation.